Modernisation of an industrial machinery control system
← Back to homeSolution 04

Retrofit and
modernisation

We update the control and necessary elements of existing equipment when its mechanical base can continue to provide service.

Discuss a requirement

Modernising what works can be the right solution.

We review the condition of the equipment, its limitations and component availability before defining the scope of the work.

The aim is to restore clear and reliable operation, adapt the machine to new requirements and reduce dependence on obsolete components.

Technical capability

What we can update

01

Obsolete control

Replacement or migration of PLCs, interfaces and unsupported components.

02

Electrical panels

Renewal of control and power systems according to the project scope.

03

Sensors and drives

Updating detection, operation and movement to improve machine use.

04

Work sequences

Reprogramming to adapt equipment to new products or process rates.

05

Fault diagnostics

Improved alarms and information available to locate incidents.

06

Line integration

Coordination of modernised equipment with other machinery or control systems.

How we work

Updating with a defined scope

01 · Diagnose

Condition and limitations

We review what can be retained, what must be replaced and why.

02 · Design

Modernisation plan

We define components, integration and the intervention sequence.

03 · Execute

Replacement and testing

We carry out the update, verify functions and adjust operation.

Let us discuss the equipment

What do you need to update?

Contact us